Wednesday, March 18, 2009

Demo has begun!
We're starting with the blue room... first we removed all the trim (trying to save most of it), then had to open up one of the walls just to see what we were in for.
Behind this wall are 2x3 studs. This house is old!
Here is step one of stripping the trim down. We did two coats of stripper and got down to the wood. Still need to do some serious sanding to get them paintable. This is the side trim for the doorway.
And here are the windows, we removed the trim and the weighted windows. The plan is to redo the windows and possibly keep the weights (update them a bit and add insulation though).

yea this will be a big project, but so far we're just taking it down and putting it back up (with insulation). Hopefully we won't hit too many surprises.

Surprise #1: The wood floor was laid down after the baseboards so the baseboards really can't be removed without being pretty much ripped apart. So much for saving the baseboards. Maybe we'll have better luck in the other rooms.
Surprise #2: The studs are 2x3's instead of 2x4's. Not sure what type of things we'll run into with this.
Surprise #3: The walls are 2 layers of plaster board or something EXTREMELY hard to break through. Demo is going to be a slow process!

No comments: